Terawulf Energizes 50 MW at Nuclear-Powered Bitcoin Mining Facility Nautilus

Bitcoin mining company Terawulf has announced the full deployment of its 50-megawatt (MW) stake in the nuclear-powered Nautilus Cryptomine facility. The behind-the-meter bitcoin mining facility is powered by 100% nuclear power and benefits from a fixed power cost of $0.02 per

Avalikus nimekirjas oleva Bitcoin Miner Cleansparki hashrate ületab 3 Exahash, Firma rekordid igapäevaste toodangu kõrgeimal tasemel 13.25 BTC

Bitcoin miner Cleanspark says it experienced accelerated growth amid the crypto winter this year and the operations hashrate has surpassed 3 eksahas sekundis (EH/s), tripling in less than twelve monthstime. The news follows a number of expansions bitcoin mining